24
2020
07
Desulfurization and Denitrification Project for the 2×660 MW Expansion of Shenhua Guohua Ningdong Power Plant
The desulfurization and denitrification project for the Shenhua Guohua Ningdong Power Plant’s 2×660 MW expansion is located in Shicao Village, Lingwu City, Yinchuan, Ningxia Hui Autonomous Region. Project scope: construction of two 660 MW ultra-supercritical air‑cooled units, along with the simultaneous installation of a limestone–gypsum wet flue‑gas desulfurization system and an SCR denitrification unit. Total project investment: RMB 3 billion. 1. Administrative procedures: All preliminary permits and approvals have been obtained. 2. Design status: Design work has not yet commenced; the project is currently undergoing tendering for survey and design services, with a deadline of June 21, 2013. 3. Civil engineering construction: Main civil works have not yet begun; construction bidding will proceed once the design phase is completed. 4. Equipment procurement: The status of equipment procurement remains unclear.