Assembly Process for Electric Valve Actuators
We often use electric valve actuators in many applications, yet our understanding of them remains limited. So, what is the assembly process for these actuators? Let’s take a look together.
1. Preparatory Work Before Assembly
Before assembly, valve components must have machining burrs and weld spatter removed, and packing and gaskets must be cleaned and cut to size.
2. Cleaning of Valve Components
As valves used for fluid‑pipeline control and installation, their internal cavities must be kept clean. This requirement is especially stringent for valves employed in the nuclear power, pharmaceutical, and food industries, where maintaining media purity and preventing contamination are critical. Prior to assembly, valve components should be thoroughly cleaned to remove chips, residual lubricants, coolants, burrs, weld spatter, and other contaminants. Washing is typically performed by spraying or brushing with alkaline‑containing water or hot water (kerosene may also be used for wiping), or by ultrasonic cleaning. After grinding and polishing, a final rinse is required; this usually involves scrubbing the sealing surfaces with gasoline, followed by drying with compressed air and wiping clean with a cloth.
3. Preparation of Packing and Gaskets
Graphite packing, owing to its corrosion resistance, excellent sealing performance, and low coefficient of friction, is widely employed. Packing and gaskets are used to prevent leakage of the process medium along the valve stem and bonnet, as well as at the flange joint surfaces. All these components must be properly prepared—cut to size and readied for installation—prior to valve assembly.
4. Valve Assembly
Valves are typically assembled with the valve body serving as the reference component, following the sequence and procedures specified in the manufacturing process. Prior to assembly, all parts and components must be inspected to ensure that no deburred or uncleaned parts proceed to final assembly. During assembly, parts should be handled gently to prevent impacts, dents, or scratches that could damage machined surfaces. Moving parts of the valve—such as the valve stem and bearings—should be lubricated with industrial-grade grease. The valve bonnet and the valve body flange are usually joined by bolts; when tightening these bolts, they must be fastened in a staggered, alternating pattern, in multiple passes, and with even torque. Failure to do so may cause uneven stress on the joint between the valve body and bonnet, leading to leakage in flow‑control valves. The wrench used for tightening should not be excessively long, to avoid over‑tightening and compromising bolt strength. For valves with strict preload requirements, a torque wrench should be employed to tighten the bolts to the specified torque value. After completing final assembly, the actuator mechanism should be rotated to verify that the valve’s moving elements operate smoothly and without binding. The installation orientation of components such as the pressure‑reducing valve bonnet and support brackets must conform to the drawing specifications. Only valves that pass all inspections may proceed to testing.
That concludes our overview of the assembly process for valve actuators. I hope everything is now clear.