img
Your location:
Homepage
/
/
Company News
SURPASS electric actuator
Details 白箭头 黑箭头
Split installation site diagram for a chemical plant in Jiangxi
Details 白箭头 黑箭头
Fulida Power Plant replaces Siemens 2SA3 series actuator-SURPASS
The 2SA3 series electric actuators originally used by Fulida Power Plant are now replaced with SURPASS 5 vector frequency conversion 2SA5 series actuators according to the requirements of working conditions and adjustment methods and accuracy requirements.
Details 白箭头 黑箭头
Urumqi Municipal Solid Waste Incineration Power Plant Construction Project
Details 白箭头 黑箭头
Shenhua Guohua Ningdong Power Plant 2×660MW Expansion Project Desulfurization and Denitration Project
Shenhua Guohua Ningdong Power Plant 2×660MW expansion project desulfurization and denitrification project, the project is located in Shicao Village, Lingwu City, Yinchuan City, Ningxia Hui Autonomous Region. Project construction scale: construct 2×660MW ultra-supercritical air-cooled units, simultaneously construct limestone-gypsum wet desulfurization facilities and SCR denitrification equipment. The total investment of the project is 300 million yuan. 1. Procedures: The current procedures have been completed. 2. Design completion status: The project has not yet begun design, and is currently undergoing survey and design bidding. The deadline is June 21, 2013. 3. Civil construction: The main construction of the project has not yet started, and construction bidding will be conducted after the design is completed. 4. Equipment procurement status: The equipment procurement status of this project is not yet clear.
Details 白箭头 黑箭头
Construction of desulfurization and denitrification projects for 2×600MW units of Huaneng Qinling Power Plant
Details 白箭头 黑箭头
Previous page
1
2

© 2020 Surpass Automation Technology Co., Ltd. All rights reserved